BeltLine Southwest Corridor Design Meeting

Date: Thursday, April 25, 2013
Time: 6:30pm to 8:00pm
Location: Washington High School—Auditorium (near intersection of Beckwith Street & Whitehouse), 45 Whitehouse Drive, SW Atlanta, GA 30314

Details: Learn more about the Southwest Multi-Use Trail. Please join us for the kick-off meeting to discuss the preliminary design of the Southwest Corridor, including transit and a multi-use trail. This 3.4 mile corridor will start at Lena Avenue (Washington Park) and will end at Allene Avenue. The corridor design will also include streetscapes, landscape design, access point identification, and proposed transit stops.

Southwest Connector Trail Groundbreaking

Southwest Connector Trail Groundbreaking

Date: Saturday, January 12, 2013
Time: 9:30am
Location: Beecher Hills Elementary School, 2257 Bollingbrook Drive, 30311

Details: Southwest Connector Trail the Next Link in 33-Mile Network of Paved Trails

This PATH Foundation-led project will ultimately connect to the Atlanta BeltLine through the Westview neighborhood in southwest Atlanta.

The Southwest Connector Trail winds through a serene stretch of woods, originating at the existing Lionel Hampton Trail, passing by Beecher Hills Elementary School, and emerging onto Westwood Avenue. When complete, this trail will run 4.5 miles. With connections between the Beecher Hills and Westwood Terrace neighborhoods, the trail will allow for improved access to Beecher Hills Elementary School.

Text and photograph source: Atlanta BeltLine